Light steel frame · Portugal & Spain

Every house,
seen through.

Most builders show you a render. We start with what holds it up — then build it in front of you, and hand you the keys in five months.

Scroll to build it

Why steel

Concrete hides its mistakes.
Steel can’t.

5 months

From signed drawings to keys in hand. Fixed date, written into the contract.

400 mm

Stud centres, identical on every wall. Cut in the factory, not on the plot.

±1 mm

Tolerance across the whole frame. Timber moves. Steel doesn’t.

A+ rating

Thermal-break profiles and a continuous insulation layer, as standard.

Five months

What actually happens,
week by week.

  1. Week 02

    Foundation

    Lighter frame, lighter slab. Less excavation, less concrete, less time.

  2. Week 06

    Frame up

    The structure lands flat-packed and goes up in eleven days.

  3. Week 11

    Envelope closed

    Roof, windows, insulation. Watertight — trades move inside.

  4. Week 20

    Keys

    Commissioned, certified, cleaned. You walk in.

Start here

Send us your plot.
We’ll tell you what fits.

A short assessment of what your land allows — setbacks, height limits, access, orientation. No cost, no obligation, back within two working days.